How Landlords Should Get and Compare Contractor Quotes (Without Getting Burned)

Ken HovenKen Hoven|Business Documentation Specialist
8 min read
Property Management Forms Bundle — 34 Landlord & Rental PDF Templates — template preview

Key Takeaways

  • Write a one-page scope before you call anyone; quotes against the same written scope are the only quotes you can actually compare.
  • Know the typical cost range for the job before the first bid arrives, so you can recognise both a lowball and a gouge.
  • A quote must name the scope, materials, exclusions, price, payment schedule, start and finish dates, permit responsibility, and warranty — or it is not a quote.
  • Verify licence, insurance, and references yourself. Do not rely on a lead-generation site's "pre-screened" badge.
  • Choose on completeness and accountability. The cheapest bid is usually the one with the most left out.

"Get three quotes" is the standard advice for any repair, and it is good advice right up to the point where the three quotes arrive and cannot be compared. One is $1,400, one is $2,650, one is a text message that says "about 2k." Nobody knows whether the $1,400 includes the permit, and the $2,650 contractor has stopped returning calls.

The landlord's problem is not getting quotes. It is getting quotes that answer the same question. This guide is the process that produces them — written from the owner's side, for someone who may be managing a property from an hour away and who cannot afford to redo the work.

Step 1: Decide what the job actually is

Before calling anyone, write the scope down. Half a page is enough for most repairs. Cover:

  • The problem as observed, with photos (tenants can send these).
  • What you want at the end: "working water heater, same capacity, code-compliant" or "replace kitchen faucet with a two-handle, stainless unit of mid-grade quality."
  • What is included: removal and disposal of the old unit, permit if required, any patching or painting of surfaces disturbed by the work.
  • What is excluded or to be priced separately: "quote repair of any corroded supply piping found behind the wall as a separate line."
  • Access and scheduling constraints: tenant occupied, 24-hour notice required, working hours.

This step also forces a decision you should make deliberately: repair or replace? A 14-year-old water heater with a leaking tank is a replacement, not a repair, and asking for repair quotes wastes everyone's time. If you are unsure, a decision guide for the specific system — water heater, air conditioner, roof — will usually settle it in five minutes based on age and failure mode.

Step 2: Know the price range before the first quote arrives

You cannot judge a quote without a reference point. Before you request bids, find out what the job typically costs in your area for professional work. A repair cost planner that separates materials from labor and gives a professional price range is the quickest way to do this; for larger trades, a call to a supply house ("what does a 50-gallon gas water heater run these days?") gives you the materials floor, and labor is typically 1–2 times materials for straightforward replacements.

The point is not to hold contractors to an online number. It is to recognise the two failure modes: a bid far below range (something is missing, or the contractor is unlicensed and uninsured), and a bid far above range (you are being priced as an absentee owner who will not check). Either one deserves a question, not an automatic yes or no.

Step 3: Find contractors from more than one source

Three quotes from three contractors who all came from the same lead-generation website are often three versions of the same price, because those contractors pay for the same leads and know what the market will bear. Mix your sources:

  • Your state or county licensing board's lookup tool — search by trade and area, then verify the licence is current and complaint-free.
  • The trade supply house. Plumbing and electrical counters know which local contractors buy good material and pay their bills.
  • Other landlords in your market, especially those with similar-age properties.
  • Recent permit records for your area, which show who is actually pulling permits for the kind of work you need.
  • Lead-generation and review sites — fine as one source among several, never as the only one. Treat "pre-screened" and "verified" badges as marketing unless the site tells you exactly what was checked and when.

HomeRepairPlanner's guide to finding and vetting a contractor covers licensing by trade and the verification steps in more detail.

Download the Template

Complete Property Management Bundle

The template this guide walks through — ready to customize with your details in ZIP Bundle — 34 PDFs format.

Step 4: Request the quote properly

Send each contractor the same written scope and photos. Ask for a written quote, and tell them what it needs to contain. A quote that lacks any of these is not comparable and, frankly, is not a quote:

  1. Scope of work in enough detail to know what is and is not included.
  2. Materials and fixtures specified by type, grade, or allowance amount.
  3. Exclusions, stated explicitly.
  4. Price, with labor and materials shown separately where practical.
  5. Payment schedule: deposit, progress payments, final payment, and what triggers each.
  6. Start date and expected duration.
  7. Who pulls the permit and who pays for it.
  8. Warranty on workmanship, in months or years, in writing.
  9. Quote validity period.
  10. Licence number and a statement that the contractor carries general liability and workers' compensation insurance.

If a contractor will not provide this in writing for a job over a few hundred dollars, that answers the question for you. Contractors who run a professional operation have a template and will send it the same day. For the contractor's side of this, see how to write a contractor estimate — knowing what a good one looks like from the inside makes it easy to spot a poor one.

Step 5: Verify before you compare

Before spending time on the numbers, remove any bidder who fails verification. This takes fifteen minutes per contractor and is the part most landlords skip.

  • Licence: look it up yourself on the licensing board's site. Confirm the name on the licence matches the business quoting, the classification covers this trade, and it is active with no open disciplinary actions.
  • Insurance: ask for a certificate of insurance naming you (or your LLC) as certificate holder, issued directly by the insurer or agent. A photocopy from the contractor proves nothing about whether the policy is still in force. Confirm general liability and, if they have employees, workers' compensation.
  • References: ask for two from jobs of similar type in the last year, and call them. Ask what went wrong and how it was handled, not whether they were happy.
  • Entity: confirm the business is registered with your state and that the name on the quote, the licence, the insurance, and the eventual contract all match.

Step 6: Compare on completeness, then price

Lay the surviving quotes side by side and reconcile them line by line against your scope. Common gaps that make a cheap quote expensive:

  • Permit excluded or "by owner."
  • Disposal and haul-away not included.
  • Lower-grade material than the others assumed.
  • No allowance for hidden conditions, so every surprise becomes a change order.
  • Patching and painting of disturbed surfaces excluded.
  • No written warranty.
  • Payment schedule front-loaded (large deposit, most of the balance before completion).

Normalise the bids: add the missing items at a reasonable cost to the quotes that exclude them, and compare the adjusted totals. Very often the "cheapest" quote becomes the middle quote once it includes what the others already did. If you do a lot of this, a simple spreadsheet with one column per contractor and one row per scope item is worth setting up once.

Then weigh the non-price factors honestly. A contractor who answered quickly, wrote a complete quote, and had their insurance certificate sent within a day will probably run the job the same way. The one who sent a two-line text will probably run the job the way they wrote the quote.

Step 7: Put it in a contract

For anything beyond a small service call, the accepted quote should be attached to or converted into a short written agreement that both parties sign. It should restate the scope, price, payment schedule, dates, permit responsibility, warranty, insurance requirement, change-order procedure (changes in writing, priced before work proceeds), and cleanup. Many states require specific terms in residential home-improvement contracts; your state attorney general or consumer protection office usually publishes a plain-language summary.

Keep the signed contract, the certificate of insurance, the permit, inspection sign-offs, and the final invoice together in the property file. If a deposit dispute, insurance claim, or sale ever requires you to prove what was done and by whom, that file is the answer.

A note on tenant-occupied units

Coordinate access yourself. Give the tenant the notice your state requires (commonly 24 hours), tell them who is coming and when, and tell the contractor the tenant's constraints. Do not give contractors a key without the tenant's knowledge, and do not let the tenant and contractor negotiate scope between themselves. You are the client; keep the lines of communication running through you or your property manager.

Frequently Asked Questions

How many contractor quotes should a landlord get?

Three is the usual recommendation for anything over a few hundred dollars, and it is enough when all three bid the same written scope. For small routine jobs with a contractor you already trust, one quote at pre-agreed rates is fine. For major work (roof, HVAC, sewer line), get three and make sure at least one is from a contractor who did not come from the same referral source as the others.

Why are contractor quotes so different from each other?

Usually because they are not pricing the same job. One includes permit fees and haul-away, another does not. One specifies a mid-grade fixture, another assumes builder-grade. One includes repairing what they find behind the wall, another will change-order it. The spread shrinks dramatically when every bidder works from the same written scope and the same allowances.

Is it OK to tell a contractor what the other quotes were?

You can, but it rarely helps. Telling a contractor the lowest number invites them to match it by quietly cutting scope. It is more useful to tell them where their quote differs from the others in content ("yours is the only one that excludes the permit") and let them explain or revise.

Should a landlord pay a deposit to a contractor?

A deposit is normal for work that requires ordering materials. The amount varies by state law and trade; 10–33% is a common range for residential work, and several states cap deposits for home improvement contracts. Never pay the full amount up front, and never pay a deposit in cash without a signed contract and receipt.

What if the tenant arranges the repair?

Avoid it unless the lease specifically allows it and sets limits. You lose control of the scope, the price, the contractor's insurance status, and the quality — and you may still be liable for the outcome. Handle contractor selection yourself or through your property manager.

Ready-to-Use Template

Complete Property Management Bundle

Professionally designed and formatted. Available in ZIP Bundle — 34 PDFs format. 30-day money-back guarantee.

One-time purchase — use forever.

Ken Hoven

Ken Hoven

Founder, PrintReadyForms · 25 years writing technical documents, contracts, scopes of work, and procedures

Published

All guides on PrintReadyForms are written to help business owners, landlords, contractors, and HR professionals use professional documents effectively. This content is for informational purposes only and does not constitute legal or financial advice. Consult a qualified professional for advice specific to your situation.